JSS 55555 SPECIFICATIONS IN DETAIL PDF

JSS SPECIFICATIONS IN DETAIL EPUB – RELATED SPECIFICATIONS Joint Services Specifications JSS Revision No. In such cases. Up to °C+/- 3°C JSS IS , 5 to Hz, G JSS , (c) The detailed specifications of environmental stress screening capabilities are. For more details, refer Procedure 6, Test Condition K, Page no of Refer Test No, Page no of Defence Standard JSS

Author: Shakataxe Kazshura
Country: Uruguay
Language: English (Spanish)
Genre: Technology
Published (Last): 8 October 2015
Pages: 374
PDF File Size: 18.66 Mb
ePub File Size: 19.54 Mb
ISBN: 190-8-48815-481-5
Downloads: 33498
Price: Free* [*Free Regsitration Required]
Uploader: Zulkirn

JSS 55555 SPECIFICATIONS IN DETAIL EPUB

The following Test is carried out on product. The width of the super structure can be adjusted specificatikns one side of the structure can be moved on guided wheels. The operation of these zones is as per the requirement of JSS Reinforced concrete test bed with a Degrees gradient towards centre and load bearing capacity of detaip to 1 to 1.

The Driving rain test facility is made of Brick wall up to 1 meter height on two sides with special foundation.

TOP Related  UN HILITO DE SANGRE EUSEBIO RUVALCABA PDF

JSS SPECIFICATIONS IN DETAIL EPUB

Powder coated MS super structure is used for long life. The control station consists of a stand-alone IP55 protected control cum operating panel. Overview Features Technical Specifications.

Each main header pipe will have pressure gauges along with strainer to protect the nozzle blocks from dust particles. Features Super Structure The super structure is built using GI frames with anti-corrosive coating and profiles to support the pipelines.

JSS 55555 – Antifungal Test – Electronics

A closed loop water circulation system consists of industrial grade pumps for the discharge of water. All the nozzles are mounted on the header pipes which in turn is connected to the main header pipe. Header Pipes All the nozzles are mounted on the header pipes which in turn is connected to the main header pipe.

The centre of the test bed have a water channel with a MS grated covering. The sprayed water is recirculated through a water channel, passing through a filtration system and returns to the main water sump.

In such cases the details shall be as given in the relevant. The super structure is built using GI frames with jss specifications in detail coating and profiles to specificafions the pipelines.

TOP Related  CAD50BD PDF

The control panel jss specifications in detail of all the electrical switchgears and operating instruments needed for a smooth operation of the Driving rain test facility. Water Recirculation System Jws closed loop water circulation system consists of industrial grade pumps for the discharge of water. Control Station The main control station is provided in the control room.

The nozzles can be easily removed for revalidating the pressure.

The main control station is provided in the control room. Jss specifications in detail Shower Area No. The Driving rain test facility is divided into multiple zones. Test Space Test Bed: Zones The Driving rain test facility is divided into multiple zones.